A 10-V-emf battery is connected in series with the following: a 2-µF capacitor, a 2.0-Ω resistor, an ammeter, and a switch, initially open; a voltmeter is connected in parallel across the capacitor. At the instant the switch is closed, what are the current and capacitor voltage readings, respectively?

Answers

Answer 1

Answer:

I = 5.0 A  V=0

Explanation:

Assuming that the ammeter is an ideal one (which means that the internal resistance is negligible compared with other resistors in the circuit), as the voltage through the capacitor can't change instantaneously, just after the switch is closed, will behave like a short, so applying Ohm's law, the current in the circuit will be as follows:

[tex]I =\frac{V}{R} = \frac{10 V}{2.0 \Omega} = 5.0 A[/tex]

As the voltage in the capacitor, can't change instantaneously, assuming an ideal voltmeter (infinite resistance) , the lecture on the voltmeter across the capacitor will be just 0.

As time goes by, the voltage measured will follow the following equation:

[tex]V = V0*( 1-e^{-\frac{t}{R*C}} )[/tex]

We see that when t=0, V=0.


Related Questions

Define a function pyramid_volume with parameters base_length, base_width, and pyramid_height, that returns the volume of a pyramid with a rectangular base. Sample output with inputs: 4.5 2.1 3.0 Volume for 4.5, 2.1, 3.0 is: 9.45 Relevant geometry equations: Volume

Answers

Hi, you haven't provided the programing language in which you need the code, I'll just explain how to do it using Python, and you can apply a similar method for any programming language.

Answer:

1. def pyramid_volume(base_length, base_width, pyramid_height):

2.     volume = base_length*base_width*pyramid_height/3

3.     return(volume)

Explanation step by step:

In the first line of code, we define the function pyramid_volume and it's input parametersIn the second line, we perform operations with the input values to get the volume of the pyramid with a rectangular base, the formula is V = l*w*h/3In the last line of code, we return the volume  

In the image below you can see the result of calling the function with input 4.5, 2.1, 3.0.

Final answer:

The function 'pyramid_volume' can be used to compute the volume of a pyramid with a rectangular base. Its calculation uses the equation: V = (base_area * height) / 3, where base_area = base_length * base_width. Given the inputs 4.5, 2.1, and 3.0 for base_length, base_width, and pyramid_height respectively, the volume would be 9.45

Explanation:

The function pyramid_volume is best defined in the context of Mathematics, particularly, geometric formulas. To compute the volume of a pyramid with a rectangular base, you can utilize the formula: V = (base_area * height) / 3. Here, base_area is equal to base_length times base_width. Hence, the function pyramid_volume could be defined as follows:

Volume = lambda base_length, base_width, pyramid_height: (base_length * base_width * pyramid_height) / 3.

Thus, if you input 4.5, 2.1, and 3.0 as your base_length, base_width, pyramid_height respectively into the function, it will return the volume of the pyramid, which in this case is 9.45.

Learn more about Volume Computation here:

https://brainly.com/question/33636745

#SPJ3

Compute the estimated actual endurance limit for SAE 4130 WQT 1300 steel bar with a rectangular cross section of 20.0 mm by 60 mm. It is to be machined and subjected to repeated and reversed bending stress. A reliability of 99% is desired

Answers

Answer:

estimated actual endurance strength = 183.22 MPa

Explanation:

given data

actual endurance limit for SAE 4130 WQT 1300

cross section = 20.0 mm by 60 mm

reliability = 99%

solution

we use here table for get some value for AISI 4130 WQT 1300 steel

Sut = 676 MPa

Sn = 260 MPa

and here

stress factor Cst = 1

and wrought steel Cm = 1

and reliability factor Cr is = 0.81

so here equivalent diameter will be

equivalent diameter = 0.808 [tex]\sqrt{bh}[/tex]    ...........1

equivalent diameter = 0. 808 [tex]\sqrt{20*60}[/tex]  

equivalent diameter = 28 mm

so here size factor will be = 0.87 by the table

so now we can get estimated actual endurance strength will be

actual endurance strength = Sn × Cm × Cst × Cr × Cs ...............2

put here value

actual endurance strength = 260 × 1 × 1 × 0.81 × 0.87

actual endurance strength = 183.22 MPa

From an email message sent to all employees of a law firm advising them to be alert for a new virus: This virus has been known to cause the destruction of files, and it is very important that you perform a search of your hard drive to try and attempt eradication of it using the search feature. Search for .EDT file extensions and delete them. Then the problem will be solved

Answers

Answer:true

Explanation: I’m fram wokonda

The email message you provided is advising law firm employees to be alert for a new virus that can destroy files.

How to explain the emails

The virus is associated with .EDT file extensions, so the email message suggests that employees search their hard drives for these files and delete them.

This advice is generally sound. .EDT files are associated with Adobe Digital Editions, a software program that is used to read eBooks. If a .EDT file is infected with a virus, it could potentially damage or destroy the eBook that it is associated with.

However, it is important to note that not all .EDT files are infected with viruses. It is possible that an employee may have a legitimate .EDT file that they need to keep. Therefore, before deleting any .EDT files, it is important to make sure that they are not infected.

Learn more about email

https://brainly.com/question/24688558

#SPJ2

How many electrons move past a fixed reference point every t = 2.55 ps if the current is i = 7.3 μA ? Express your answer as an integer.

Answers

Final answer:

The number of electrons that move past a fixed reference point in 2.55 ps when the current is 7.3  extmu A is approximately 116, after calculating the total charge and then dividing it by the charge of an electron.

Explanation:

The number of electrons moving past a fixed reference point in a given time interval when the electric current is known can be calculated by first determining the total charge that passes through the reference point and then dividing that by the charge per electron. The total charge ( extit{Q}) that moves through a fixed point is the product of the current ( extit{I}) and the time interval ( extit{t}), which is expressed by the formula  extit{Q} =  extit{I}  imes  extit{t}. Given that the charge of an electron is approximately -1.60  imes 10^{-19} C (coulombs), one can calculate the number of electrons by dividing the total charge by the electronic charge.



In this case, the current is 7.3  extmu A (microamperes), which is equal to 7.3  imes 10^{-6} A (amperes), and the time interval is 2.55 ps (picoseconds), or 2.55  imes 10^{-12} s (seconds). Using the formula  extit{Q} =  extit{I}  imes  extit{t}, the total charge moved past the reference point is calculated as follows:



Q = 7.3  imes 10^{-6} A  imes 2.55  imes 10^{-12} s = 1.8615  imes 10^{-17} C



Next, to find the number of electrons that move past the reference point, we divide the total charge by the charge of an electron:



Number of electrons =  rac{Q}{e} =  rac{1.8615  imes 10^{-17} C}{1.60  imes 10^{-19} C/e^-}



This yields approximately 116.34 electrons. Since the question asks for an integer value, we round this to 116 electrons as the number of electrons that move past a fixed reference point every 2.55 ps if the current is 7.3  extmu A.

To find the number of electrons moving past a fixed reference point with a given current, you can use the formula: Current (i) = Charge (q) / Time (t). By substituting the known values and calculating, you can determine the number of electrons passing the point at a specific time.

To find the number of electrons moving past a fixed reference point with given current:

Given: Current (i) = 7.3 μA = 7.3 x 10^-6 A

Formula: Current (i) = Charge (q) / Time (t)

Calculation: Number of electrons = (Current x Time) / Charge of an electron

Substitute values and calculate.

Determine the values of the lumped parasitic capacitor and inductor in a 5 ft long two-wire transmission line with air dielectric (See Chapter 7 in the Stanley and Harrington textbook). Each wire has a diameter of 1 mm and the separation between the wires is 1 inch. Show your calculations and the equations used.

Answers

Answer: See attachment below

Explanation:

Consider the generic state space model *(t)= Ax(t) + Bu(t) y(t) = Cx(t)+Du(t). Use the definition of Al to show that x(t)=1*[4=) Bu(t)dt is the state response under input u(t).

Answers

Answer:

Explanation:

[tex]\dot x (t) - ax(t)=bu(t)\\\\e^{-at}\dot x = e^{-at}ax = \frac{d}{dt} (e^{-at})=e^{-at}bu\\\\\int\limits^t_0 \frac{d}{d\tau}(e^{-a\tau}x(\tau))d\tau=e^{-at}x(t)-x(0)=\int\limits^t_0 e^{-a\tau}bu(\tau))d\tau\\\\x(t)=e^{at}x(0)+ \int\limits^t_0 e^{-a(t-\tau)}bu(\tau))d\tau[/tex]

Similarly,

[tex]e^{-At}\dot x(t) -e^{-At}Ax(t) = \frac{d}{dt} (e^{-At}x(t))=e^{-At}Bu(t)\\\\\int\limits^t_0 \frac{d}{d\tau}(e^{-A\tau}x(\tau))d\tau=e^{-At}x(t)-e^{-A.0}x(0)=\int\limits^t_0 e^{-A\tau}Bu(\tau))d\tau\\\\since\:\:\:e^{-A.0}=I \:\:\: and\:\:\:[e^{-At}]^{-1}=e^{At}\\\\x(t)=e^{At}x(0)+ e^{At}\int\limits^t_0 e^{-A\tau}Bu(\tau))d\tau\\\\x(t)=e^{At}x(0)+ \int\limits^t_0 e^{A(t-\tau)}Bu(\tau))d\tau[/tex]

For initial condition x(0) = 0

[tex]x(t)= \int\limits^t_0 e^{A(t-\tau)}Bu(\tau))d\tau[/tex]

a) the pre-exponential factor and activation energy for the hydrolysis of t-butyl chloride are 2.1xE16 sec-1 and 102 kJ mol-1, respectively. calculate the values of delta S and delta H at 286 K for the reaction.
b)the pre-exponential factor and activation energy for the gas-phase cycloaddition of maleic anyhyrdride and cycopentadiene are 5.9xE7 M-1S-1 and 51 kJ mol-1 respectively. calculate values of delta S and delta H at 293 K for the reaction.

Answers

Answer:

Delta S = 356.64J/mol and Delta H = 99620J/mol

Explanation:

The detailed steps and appropriate use of the arrehenius equation and necessary susbtitution were made as shown in the attached file.

Write a static method called quadrant that takes as parameters a pair of real numbers representing an (x, y) point and that returns the quadrant number for that point. Recall that quadrants are numbered as integers from 1 to 4 with the upper-right quadrant numbered 1 and the subsequent quadrants numbered in a counter-clockwise fashion:

Answers

Full Question

Write a static method called quadrant that takes as parameters a pair of real numbers representing an (x, y) point and that returns the quadrant number for that point.

Recall that quadrants are numbered as integers from 1 to 4 with the upper-right quadrant numbered 1 and the subsequent quadrants numbered in a counter-clockwise fashion. Notice that the quadrant is determined by whether the x and y coordinates are positive or negative numbers. If a point falls on the x-axis or the y-axis, then the method should return 0.

Answer

public int quadrant(double x, double y) // Line 1

{

if(x > 0 && y > 0){ //Line 2

return 1;

}

if(x < 0 && y > 0){ // Line 3

return 2;

}

if(x < 0 && y < 0) {// Line 4

return 3;

}

if(x > 0 && y < 0) {// Line 5

return 4;

}

return 0;

}

Explanation:

Line 1 defines the static method.

The method is named quadrant and its of type integer.

Along with the method definition, two variables x and y of type double are also declared

Line 2 checks if x and y are greater than 0.

If yes then the program returns 1

Line 3 checks if x is less than 0 and y is greater than 0

If yes then the program returns 2

Line 4 checks if x and y are less than 0

If yes then the program returns 3

Line 5 checks is x is greater than 0 and y is less than 0

If yes then the program returns 4

Define the following concepts in your own words: (a) stiffness, (b) strength, (c) ductility, (d) yielding, (e) toughness, and (f) strain hardening.

Answers

Answer:

Please find detail answer given below

Explanation:

(a) Stiffness

It is defined as the property of a material that is rigid and difficult to bend. The example of stiffness is the rubber band. If an elastic band is stretched with two fingers, the stiffness is less and the flexibility is greater. Similarly, if we use the rubber band assembly and stretch it with two fingers, the stiffness will be more rigid and the flexibility will be less.

(b) Strength

Force measures how much stress can be applied to an element before it is permanently deformed or fractured.

(c) ductility

Ductility is a measure of a metal's ability to resist tensile stress: any force that separates the two ends of an object. The tug of war game provides a good example of the tension of tension that is applied to a rope. Ductility is the plastic deformation that occurs in the metal as a result of such types of deformation. The term "ductile" literally means that a metallic substance is capable of stretching on a thin wire without weakening or becoming more fragile in the process.

(d) Yielding

The performance of a material is explained as the tension at which a material begins to deform irreversibly. Before the elastic limit, the material will deform elastically, which means that it will return to its original shape when the applied tension is eliminated (that is, without permanent and visible change in the shape of the material).

(e) toughness

The ability of a metal to deform plastically and to absorb energy in the process before the fracture is called resistance. The emphasis of this definition should be placed on the ability to absorb energy before the fracture.

(f) strain hardening

The process of strain hardening is at what time when metal is strained beyond the yield point. An intensifying pressure is required to produce extra plastic deformation and the metal apparently becomes stronger and more difficult to deform.

Calculate the link parameter and channel utilization efficiency (in error-free channels) for a system with the following parameters, if the simplex stop and wait protocol is used. a) Bitrate: R=12 Mbps, Modulation: BPSK, distance between the transmitter and receiver: d-6 miles, propagation velocity:v3 x 108 m/s and the length of each frame: L-500 bits. b) Symbolrate: Rs.10 Msps, Modulation: QPSK, distance between the transmitter and receiver: d=15 km, propagation velocity: v 3 x 108 m/s and the length of each frame: L- 256 bits.

Answers

Answer: a) 0.77 and 0.39 b) 3.9 and 0.20

Explanation:

We have to find two things here i.e link parameter and channel utilization efficiency.

a)

We are given

Bitrate= 12 Mbps,

Distance= 6 miles

Propagation Velocity= 3 x 10⁸ m/s

Length of frame= 500 bits

We know that The link parameter is related to propagation time and frame time

Where Propagation time= Bitrate x Distance= 12 Mbps x 6 miles

and Frame time= Propagation velocity x length of frame= 3 x 10⁸ x 500

So,

Link parameter= [tex]\frac{12*10^6*6*1609.34}{3*10^8*500}[/tex]

Link parameter= 0.77

Channel utilization efficiency= [tex]\frac{1}{1+2* link parameter}[/tex]

Channel utilization efficiency= 0.39

b)

We are given

Bitrate= 10 Mbps,

Distance= 15 km

Propagation Velocity= 3 x 10⁸ m/s

Length of frame= 256 bits

We know that The link parameter is related to propagation time and frame time, Here QPSK is used so bitrate is multiplied by 2,

Where Propagation time= Bitrate x Distance= 2 x 10 Mbps x 15 km

and Frame time= Propagation velocity x length of frame= 3 x 10⁸ x 256

So,

Link parameter= [tex]\frac{2*10*10^6*15*1000}{3*10^8*256}[/tex]

Link parameter= 3.9

Channel utilization efficiency= [tex]\frac{1}{1+2* link parameter}[/tex]

Channel utilization efficiency= 0.20

A signal is band-limited between 2 kHz and 2.1 kHz. If the signal is sampled at 1750 Hz, the baseband signal will lie between?a. 00 and 650 Hzb. 750 and 2000 Hzc. 100 and 110 Hzd. 250 and 350 Hz

Answers

Answer:

Explanation: 100 and 110 Hz

Here fL=2kHz, fH=2.1kHz, B=0.1kHz, fL=2kHz,  

n≤fH/(fH-fL)

n≤(2.1*1000)/((2.1-2)*1000)

n≤20

2fH/n  ≤ fs

(2*2.1*1000)/20 ≤ fs

210≤ fs

Automobiles must be able to sustain a frontal impact. Specifically, the design must allow low speed impacts with little damage, while allowing the vehicle front end structure to deform and absorb impact energy at higher speeds. Consider a frontal impact test of a vehicle with a mass of 1000 kg. a. For a low speed test (v = 2.5 m/s), compute the energy in the vehicle just prior to impact. If the bumper is a pure elastic element, what is the effective design stiffness required to limit the bumper maximum deflection during impact to 4 cm? b. At a higher speed impact of v = 25 m/s, considerable deformation occurs. To absorb the energy, the front end of a vehicle is designed to deform while providing a nearly constant force. For this condition, what is the amount of energy that must be absorbed by the deformation [neglecting the energy stored in the elastic deformation in (a)? If it is desired to limit the deformation to 10 cm, what level of resistance force is required? What is the deacceleration of the vehicle in this condition?

Answers

Answer:

Explanation:

The concept of Hooke's law was applied as it relates to deformation.

The detailed steps and appropriate substitution is as shown in the attached file.

Please write the command(s) you should use to achieve the following tasks in GDB. 1. Show the value of variable "test" in hex format. 2. Show the top four bytes on your stack word-by-word, e.g. it should look something like this "0x0102 0x0304", NOT "0x01020304". 3. Check all register values. 4. Set a breakpoint at "ece.c" line 391

Answers

Final answer:

You can use a series of commands to accomplish various tasks in GDB: 'print /x test' to view a variable in hex format, 'x/4wx $sp' to read the top four bytes on your stack by word, 'info registers' to check all register values, and 'break ece.c:391' to set a breakpoint at a specific line.

Explanation:

To achieve the tasks in GDB, you will need to use the following commands:

To show the value of variable "test" in hexadecimal format, use the command: 'print/x test'.Read the top four bytes on your stack word-by-word with the command: 'x/4wx $sp'.Check all register values with the command: 'info registers'.To set a breakpoint at "ece.c" line 391, use the command: 'break ece.c:391'.

Learn more about GDB Commands here:

https://brainly.com/question/33364038

#SPJ2

A particle, originally at rest and located at point (3 ft, 2 ft, 5 ft), is subjected to an acceleration a = {6ti + 12t^2k} ft/s^2. Determine the particle’s position (x, y, z) when t = 2 s.

Answers

The particle's position at t = 2 s is (11 ft, 2 ft, 21 ft).

To determine the particle's position at t = 2 s, we need to integrate the acceleration function twice. First, we'll find the velocity function:

[tex]\[ \mathbf{v}(t) =\int \mathbf{a}(t) \, dt \][/tex]

[tex]\[ \int (6t\mathbf{i} + 12t^2 \mathbf{k}) \, dt \\= 3t^2 \mathbf{i} + 4t^3 \mathbf{k} + \mathbf{C} \][/tex]

where C₁ is the constant of integration.

Next, we'll find the position function:

[tex]\[ \mathbf{v}(t) = \int (3t^2 \mathbf{i} + 4t^3 \mathbf{k} + \mathbf{C}_1) \, dt \\= t^3 \mathbf{i} + t^4 \mathbf{k} + \mathbf{C}_1 t + \mathbf{C}_2 \][/tex]

where C₂ is the constant of integration.

Given the initial conditions, we know that at t = 0, the particle is at rest (v = 0) and located at point (3 ft, 2 ft, 5 ft). We can use these conditions to find the values of C₁ and C₂:

[tex]c_{1} = (0 i + 0 j + 0 k) - (3(0^{2} i + 4(0^{4} k) = 0[/tex]

[tex]c_{2}[/tex][tex]= (3 i + 2 j + 5 k)[/tex] - ([tex]i + 0^{4}k[/tex] )

[tex]= (3 i + 2 j + 5 k)[/tex]

Now we can find the position at t = 2 s:

= [tex]2^{3}[/tex][tex]i[/tex] + [tex]2^{4}[/tex][tex]k + (0)(2) + (3 i + 2 j + 5 k)[/tex]

[tex]= (8 i + 16 k) + (3 i + 2 j + 5 k)[/tex]

[tex]= (11 i + 2 j + 21 k)[/tex]

So the particle's position at t = 2 s is (11 ft, 2 ft, 21 ft).

Prompt the user to enter five numbers, being five people's weights. Store the numbers in an array of doubles. Output the array's numbers on one line, each number followed by one space. (2 pts) (2) Also output the total weight, by summing the array's elements. (1 pt) (3) Also output the average of the array's elements. (1 pt) (4) Also output the max array element. (2 pts)

Answers

Answer:

import java.util.Scanner;

  public class PeopleWeights {

    public static void main(String[] args) {

    Scanner reader = new Scanner(System.in);  

    double weightOne = reader.nextDouble();

    System.out.println("Enter 1st weight:");

    double weightTwo = reader.nextDouble();

    System.out.println("Enter 2nd weight :");

    double weightThree = reader.nextDouble();

    System.out.println("Enter 3rd weight :");

    double weightFour = reader.nextDouble();

    System.out.println("Enter 4th weight :");

    double weightFive = reader.nextDouble();

    System.out.println("Enter 5th weight :");

     double sum = weightOne + weightTwo + weightThree + weightFour + weightFive;

     double[] MyArr = new double[5];

     MyArr[0] = weightOne;

     MyArr[1] = weightTwo;

     MyArr[2] = weightThree;

     MyArr[3] = weightFour;

     MyArr[4] = weightFive;

     System.out.printf("You entered: " + "%.1f %.1f %.1f %.1f %.1f ", weightOne, weightTwo, weightThree, weightFour, weightFive);

     double average = sum / 5;

     System.out.println();

     System.out.println();

     System.out.println("Total weight: " + sum);

     System.out.println("Average weight: " + average);

     double max = MyArr[0];

     for (int counter = 1; counter < MyArr.length; counter++){

        if (MyArr[counter] > max){

           max = MyArr[counter];

        }

     }

     System.out.println("Max weight: " + max);

  }

import java.util.Scanner;

  public class PeopleWeights {

    public static void main(String[] args) {

    Scanner reader = new Scanner(System.in);  

    double weightOne = reader.nextDouble();

    System.out.println("Enter 1st weight:");

    double weightTwo = reader.nextDouble();

    System.out.println("Enter 2nd weight :");

    double weightThree = reader.nextDouble();

    System.out.println("Enter 3rd weight :");

    double weightFour = reader.nextDouble();

    System.out.println("Enter 4th weight :");

    double weightFive = reader.nextDouble();

    System.out.println("Enter 5th weight :");

     double sum = weightOne + weightTwo + weightThree + weightFour + weightFive;

     double[] MyArr = new double[5];

     MyArr[0] = weightOne;

     MyArr[1] = weightTwo;

     MyArr[2] = weightThree;

     MyArr[3] = weightFour;

     MyArr[4] = weightFive;

     System.out.printf("You entered: " + "%.1f %.1f %.1f %.1f %.1f ", weightOne, weightTwo, weightThree, weightFour, weightFive);

     double average = sum / 5;

     System.out.println();

     System.out.println();

     System.out.println("Total weight: " + sum);

     System.out.println("Average weight: " + average);

     double max = MyArr[0];

     for (int counter = 1; counter < MyArr.length; counter++){

        if (MyArr[counter] > max){

           max = MyArr[counter];

        }

     }

     System.out.println("Max weight: " + max);

  }

Answer:

The source code file to this question has been attached to this response. Please download it and go through it. The file contains comments explaining significant sections of the code. Please go through the comments in the code.

The passageway between the riser and the main cavity must have a small cross-sectional area to minimize waste of casting metal: True or False

Answers

Answer:

True

Explanation:

The passageway between the riser and the main cavity must have a small cross-sectional area to reduce waste of material in metal casting.

2) The magnetic field at a distance of 2 cm from a current carrying wire is 4 μT. What is the magnetic field at a distance of 4 cm from the wire?

Answers

Answer:

2 μT

Explanation:

Assuming that the diameter of the current carrying wire is very small compared with its length, we can treat it as an infinite wire.

For an infinite wire, the magnetic field, at a distance r from the wire, is given by Biot-Savart law equation, as follows:

[tex]B = \frac{\mu0*I}{2*\pi*r}[/tex]

where:

μ₀ = 4*π*10⁻⁷

I = current carried by the wire

r = distance from the wire.

So, B₁ can be calculated as follows:

[tex]B1 = \frac{\mu0*I}{2*\pi*0.02m} = 4e-6 T[/tex]

If we change the distance where we want to know the value of B, all other factors remain constant, we can write the following expression for the new value of B, B₂:

[tex]B2 = \frac{\mu0*I}{2*\pi*0.04m}[/tex]

Dividing B1 by B2, and simplifying common terms, we have:

[tex]\frac{B1}{B2} = \frac{0.04m}{0.02m} = 2[/tex]

⇒ [tex]B2 = \frac{B1}{2} = \frac{4e-6T}{2} = 2e-6 T[/tex]

B₂ = 2 μT

A ½ in diameter rod of 5 in length is being considered as part of a mechanical
linkage in which it can experience a tensile loading and unloading during application. The
material being considered is a standard aluminum bronze with a Young’s modulus of 15.5 Msi.
What is the maximum load the rod can take before it starts to permanently elongate?
Considering the rod is designed so that it does not yield, what is the maximum energy that the
rod would store? [Hint: You can look up some properties of aluminum bronze in your machine
design book].

Answers

Answer:

The maximum load the rod can take before it starts to permanently elongate =  = 6086.84 lbf or 27075.59 N

The maximum energy that the  rod would store =2.536 ft·lbf or 3.439 J

Explanation:

We list out the variables to the question as follows

Rod diameter = 0.5 in

Length of rod = 5 in

Young's modulus of elasticity for the material = 15.5 Msi

The maximum load rthe rd can take before it starts to permanently elongate is the yield stress and it can vbe calclulated by applyng the 0.2% offset rule by taking the yeild strain to be equal to 2%

Thus Young's Modulus at yield point =[tex]\frac{Stress}{Strain}[/tex] so that the yield stess is

Yield stress = strain × Young's Modulus

= 2/100 × E = 0.002 × 15.5 Msi = 0.031 Msi = 31 ksi

The maximum load that the rod would take before it starts to permanently elongate = F = Stress×Area

where area = π·D²/4 = 0.196 in²

F = 31 kSi × 0.196 in² = 6086.84 lbf or 27075.59 N

To calculate the strain energy stored in the rod we apply the strain energy formula thus

U = V×σ²/2·E

To calculate the volume we have V = L ×π·D²/4 =5 in × 0.196 in² = 0.98 in³

then U = 0.98 × (31000)²/(2·15.5×10⁶)

= 30.43 in³·psi = 2.536 ft·lbf

or 3.439 J

The maximum energy that the rod would store = 2.536 ft·lbf

An open tank contains brine to a depth of 2 m and a 3-m-layer of oil on top of the brine. Density of brine is 1,030 kg/m3 and the density of oil is 880 kg/m3. What is the gage pressure (kPa) at the bottom of the tank?

Answers

Answer:

Gage pressure at the bottom of the tank = 46.1kP

Explanation:

Note that it is required to expressed the gage pressure ,pressure at the free surface=0 gage

Pressure due to the oil layer= (3m)*((800kg/m^3)(9.81m/s^2))/1000=25.9kpa

Pressure due to the brine layer=(2m)*((1030kg/m^3)(9.81m/s^2))/1000=20.2ka

Therefore, the pressure at the bottom=25.9+20.2=46.1kP

Which of the following method header represents Function(true, 0, 2.6)? A. void Function( bool b, double d, int c ) B. void Function( bool b, double d, double e ) C. void Function( bool b, int c, double d ) D. b and c

Answers

Answer:

(d) b and c

Explanation:

Given;

Function (true, 0, 2.6)

From the above, the function Function receives three arguments;

=>First argument (i.e true), is of type boolean

=>Second argument (i.e 0), is of type int, float or double since integers are inherently floating point numbers. Therefore 0 can be int, float or double.

=>Third argument (i.e 2.6), is a floating point number and could be of type float or double.

Therefore the method header for the function Function could be any of the following;

i). void Function (bool b, double d, double e)

ii). void Function (bool b, int c, double d)

iii). void Function (bool b, int d, float e)

iv). void Function (bool b, float d, double e)

v). void Function (bool b, double d, float e)

vi). void Function (bool b, float d, float e)

Note:

i. The ordered list above has ii and v in bold form to show that they are part of the options specified in the question.

ii. The letters b, c, d and e specified in the method declaration variations do not matter. Since they are just dummy variables, they can be any letter.

Therefore b and c are a correct representation for the method header.

A section of highway has a free-flow speed of 55 mph and a capacity of 3300 veh/hr. In a given hour, 2100 vehicles were counted at a specified point along this highway section. If the linear speed density relationship applies, what would you estimate the space-mean speed of the vehicles to be?

Answers

Answer:

Space mean speed = 44 mi/h

Explanation:

Using Greenshield's linear model

q = Uf ( D - [tex]D^{2}[/tex]/Dj )

qcap = capacity flow that gives Dcap

Dcap = Dj/2

qcap = Uf. Dj/4

Where

U = space mean speed

Uf =  free flow speed

D = density

Dj = jam density

now,

Dj = 4 × 3300/55

    = 240v/h

q = Dj ( U - [tex]U^{2}[/tex]/Uf)

2100 = 240 ( U - [tex]U^{2}[/tex]/55)

Solve for U

U = 44m/h

The specific volume of water vapor at 0.3 MPa, 160°C is 0.651 m3/kg. If the water vapor occupies a volume of 1.2 m3, determine the amount present, in kg.

Answers

The amount of water vapor present, we can use the relationship between specific volume, volume, and mass.

Specific volume= Volume/ Mass, (v) at a certain condition is 0.651 m³/kg and the volume (V) occupied by the water vapor is 1.2 m³, we can rearrange the formula to solve for mass (m):

Mass=  Specific volume/ Volume

           = 1.2/ 0.651

Mass= 1.2/ 0.651  

         = 1.844

Mass=1.844kg

Therefore,  the amount of water vapor present is approximately 1.844 kg.

Learn more about Mass, refer to the link:

https://brainly.com/question/11954533

#SPJ12

What does a blueprint slide do? Check all that apply. Provides a review of your key points near the end of your presentation Provides transitions as you move from point to point Provides an overview of your points Provides a clear explanation of one main point Provides a template for your presentation outline

Answers

Answer:

- Provides an overview of your points

Provides a review of your key points near the end of your presentation

Provides transitions as you move from point to point

Explanation:

What does a blueprint slide do? Check all that apply. Provides a review of your key points near the end of your presentation Provides transitions as you move from point to point Provides an overview of your points Provides a clear explanation of one main point Provides a template for your presentation outline

- Provides an overview of your points

Provides a review of your key points near the end of your presentation

Provides transitions as you move from point to point

. A blueprint slide would not be useful for a clear explanation of one point or as a template for your outline. You would have to use a different slide layouts.

Blueprints slide establishes how you are going to work through your presentation. it is on the introductory part of your presentation.

Contains a description of your statements, a recap of your important points after your presentations, and transitioning as you get further from source to destination.

A blueprint presentation does indeed have a uniform appearance and might even be utilized throughout a variety of methods throughout the presentation.An aesthetically compelling blueprint slideshow should, for illustration, provide an introduction of your arguments, certain transitioning to allow you to proceed between one aspect to the next one, or maybe even a summary of your essential aspects towards the end of the session.

Thus the response above is correct.

Learn more about blueprint here:

https://brainly.com/question/12139184

Write a linear equation expressing the number of t-shirts sold each month as a function of price per t-shirt. Please be explicit about what your chosen variables represent. Find the slope and intercepts of this equation (including their units). What real life meaning do these values have?

Answers

Answer:

slope of the equation = -0.006778 and the intercept = 27.11

Explanation:

The following details were also given ; They predict the monthly T shirts to be 1750 shirts, if you price them at $15.25 per shirt or 791 shirts if you price them at $21.75 per shirt.

The detailed steps and calculation is as shown in the attached file.

The velocity components u and v in a two-dimensional flow field are given by: u = 4yt ft./s, v = 4xt ft./s, where t is time. What is the time rate of change of the velocity vector V (i.e., the acceleration vector) for a fluid particle at x = 1 ft. and y = 1 ft. at time t = 1 second?

Answers

Answer:

vec(a) = 16 i + 16 j

mag(a) = 22.63 ft/s^2

Explanation:

Given,

- The two components of velocity are given for fluid flow:

                                       u = 4*y ft/s

                                       v = 4*x ft/s

Find:

What is the time rate of change of the velocity vector V (i.e., the acceleration vector) for a fluid particle at x = 1 ft. and y = 1 ft. at time t = 1 second?

Solution:

- The rate of change of velocity is given to be acceleration. We will take derivative of each components of velocity with respect to time t:

                                      a_x = du / dt

                                      a_x = 4*dy/dt

                                      a_y = dv/dt

                                      a_y = 4*dx/dt

- The expressions dx/dt is the velocity component u and dy/dt is the velocity component v:

                                     a_x = 4*(4*y) = 16y

                                     a_y = 4*(4*x) = 16x

- The acceleration vector can be expressed by:

                                     vec(a) = 16y i + 16x j

- Evaluate vector (a) at x = 1 and y = 1:

                                     vec(a) = 16*1 i + 16*1 j = 16 i + 16 j

- The magnitude of acceleration is given by:

                                     mag(a) = sqrt ( a^2_x + a^2_y )

                                     mag(a) = sqrt ( 16^2 + 16^2 )

                                     mag(a) = 22.63 ft/s^2

An ant starts at one edge of a long strip of paper that is 34.2 cm wide. She travels at 1.3 cm/s at an angle of 61◦ with the long edge. How long will it take her to get across? Answer in units of s.

Answers

Answer:

t = 30.1 sec

Explanation:

If the ant is moving at a constant speed, the velocity vector will have the same magnitude at any point, and can be decomposed in two vectors, along directions perpendicular each other.

If we choose these directions coincident with the long edge of the paper, and the other perpendicular to it, the components of the velocity vector, along these axes, can be calculated as the projections of this vector along these axes.

We are only interested in the component of the velocity across the paper, that can be calculated as follows:

vₓ = v* sin θ, where v is the magnitude of the velocity, and θ the angle that forms v with the long edge.

We know that v= 1.3 cm/s, and θ = 61º, so we can find vₓ as follows:

vₓ = 1.3 cm/s * sin 61º = 1.3 cm/s * 0.875 = 1.14 cm/s

Applying the definition of average velocity, we can solve for t:

t =[tex]\frac{x}{vx}[/tex] = [tex]\frac{34.2 cm}{1.14 cm/s} =30.1 sec[/tex]

t = 30.1 sec

Maintaining an optimistic attitude, building self-efficacy, strengthening stress inoculation, experiencing secure personal relationships, and practicing spirituality or religiosity are factors to help individuals thrive in the face of _____.

Answers

Final answer:

Optimistic attitude, self-efficacy, stress inoculation, secure relationships, and spirituality are factors that help individuals cope with adversity. These elements foster hardiness and stress-related growth, allowing individuals to manage chronic and acute stressors more effectively and pursue personal development.

Explanation:

Maintaining an optimistic attitude, building self-efficacy, strengthening stress inoculation, experiencing secure personal relationships, and practicing spirituality or religiosity are factors to help individuals thrive in the face of adversity.

Adversity can include both chronic stressors, such as long-term unemployment, and acute stressors, like illnesses or loss. These stressors require coping mechanisms and personal strengths for an individual to manage effectively. Optimism is a general tendency to expect positive outcomes and it contributes to less stress and happier dispositions. Self-efficacy, defined by Albert Bandura, is the belief in one's abilities to reach goals, which empowers a proactive response to stressors. The concept of hardiness, which relates to optimism and self-efficacy, describes those who are less affected by life's stressors and use effective coping strategies.

Furthermore, stress-related growth or thriving describes the ability of individuals to exceed previous performances and show increased strength in the face of adversity. The nurturing of secure personal relationships provides social support that can aid in increasing positive affect and reducing the number of physical symptoms during stressful times.

Problem 4: The built-in function clock returns a row vector that contains 6 elements: the first three are the current date (year, month, day) and the last three represent the current time in hours (24 hour clock), minutes, and seconds. The seconds is a real number, but all others are integers. Use function sprintf to accomplish the following formatting exercises. a) Get the current date and time and store them in p4a. The current date and time should be the date and time when the grader calls your script. b) Using the format 'YYYY:MM:DD', write the current date to string p4b. Here, YYYY, MM, and DD correspond to 4-digit year, 2-digit month, and 2-digit day, respectively. c) Using the format 'HH:MM:SS.SSSS', write the current time to string p4c. Here, HH, MM, and SS.SSSS correspond to 2-digit hour, 2-digit minute and 7-character second (2 digits before the decimal point and 4 digits after the decimal points), respectively. d) Remove the last 5 characters from the string in part (c) so that the format is now 'HH:MM:SS'. Put the answer into string p4d. e) Combine the strings in part (b) and part (d) together separated by a single space. Put theanswer in string p4e

Answers

Answer is 77 because

Calculate the molar heat capacity of a monatomic non-metallic solid at 500K which is characterized by an Einstein temperature of 300K. Express your result as a multiple of 3R.

Answers

Answer:

Explanation:

Given

Temperature of solid [tex]T=500\ K[/tex]

Einstein Temperature [tex]T_E=300\ K[/tex]

Heat Capacity in the Einstein model is given by

[tex]C_v=3R\left [ \frac{T_E}{T}\right ]^2\frac{e^{\frac{T_E}{T}}}{\left ( e^{\frac{T_E}{T}}-1\right )^2}[/tex]

[tex]e^{\frac{3}{5}}=1.822[/tex]

Substitute the values

[tex]C_v=3R\times (\frac{300}{500})^2\times (\frac{1.822}{(1.822-1)^2})[/tex]

[tex]C_v=3R\times \frac{9}{25}\times \frac{1.822}{(0.822)^2}[/tex]

[tex]C_v=0.97\times (3R)[/tex]            

Do you think the mining process is faster when you know in advance that the land must be restored? Explain.

Answers

Answer: No, the mining process isn't faster when you know in advance that the land must be restored.

Explanation:

The mining process would be slower when mining companies know in advance that the land must be restored because they have to be more careful about their impact on the environment & avoid taking unnecessary damage to ruin the land which they know they must restore.

So, it's evident how this would slow down the mining process. If there were no obligations to restore land, the mining companies would just come at the mining space and run their mining process fast without big concerns for the consequences.

But the caution definitely slows them down.

People often have different points of view. If I think mining process is faster when you know in advance that the land must be restored, My answer is No.

This is because even without miners been aware that the land had to be restored before mining, they still carelessly remove minerals without taking into cognizant the damage it will do to the land.

There are different processes of mining. They include;

UndergroundSurfacePlacer In-situ

The type of mining method used is usually based on the kind of resource that is needed, the deposit's location etc.

Learn more about Mining from

https://brainly.com/question/1278689

Other Questions
Drag the tiles to the correct boxes to complete the pairs. Match the term with the correct equation. True or False: Developing an effective team culture is an important step in putting a vision into action. In trapezoid PQRS, PQ is parallel to RS. Let X be the intersection of diagonals PR and QS. The area of triangle PQX is 20 and the area of triangle RSX is 45. Find the area of trapezoid PQRS. What is Sofias life with the mayor like? What is the irony of the situation? I will give you brainliest if you get it right!!!!!!! 0 mph and half the distance at 69.0 mph . On her return trip, she drives half the time at 31.0 mph and half the time at 69.0 mph .Part AWhat is Julie's average speed on the way to Grandmother's house?Express your answer with the appropriate units.Part BWhat is her average speed on the return trip?Express your answer with the appropriate units. Roll two dice, one white and one red. Consider these events: A : The sum is 7 B : The white die is odd C : The red die has a larger number showing than the white D : The dice match (doubles) Which pair(s) of events are disjoint (events A and B are disjoint if A B = )? Which pair(s) are independent? Which pair(s) are neither disjoint nor independent? What is -1/4 times 5/3 Automobile manufacturers produce a range of automobiles such as sports utility vehicles, luxury sedans, pickup trucks and compact cars. What fundamental econom- ic question are they addressing by making this range of products? a. How to produce goods that consumers want? b. What goods and services will be produced? c. Who to produce automobiles for? d. Why produce a variety of automobiles? Cost Benefit Analyses (CBAs) cannot be calculated after controls have been functioning for a time, as observation over time prevents precision in evaluating the benefits of the safeguard and determining whether it is functioning as intended.Select one:TrueFalse Animal tissues _____.a. are composed of undifferentiated cellsb. are joined with each other by nerve cellsc. do not necessarily have specific functionsd. contain relatively small amounts of fluide. are organized into organs A cliff diver positions herself on a cliff that angles downwards towards the edge. The length of the top of the cliff is 50.0 m and the angle of the cliff is = 21.0 below the horizontal. The cliff diver runs towards the edge of the cliff with a constant speed, and reaches the edge of the cliff in a time of 6.10 s. After running straight off the edge of the cliff (without jumping up), the diver falls h = 30.0 m before hitting the water. After leaving the edge of the cliff how much time does the diver take to get to the water?How far horizontally does the diver travel from the cliff face before hitting the water?Remember that the angle is at a downward slope to the right. A social media application would most likely do which of the following? A hardware manufacturer is seeking to improve its CPU performance by 20% on the next generation design. If the current CPU runs at 2GHz with a CPI of 4 and the new CPU will run at 2.1GHz, what does the new CPI need to be to achieve the objective? g Panther Company's bookkeeper debited supplies expense for the cost of goods sold during that month. The bookkeeper discovered the error prior to closing the books. The correcting entry would include It takes 22 pounds of seed to completely plant a 4-acre field. How many pounds of seed are needed per acre? If a 1% change in the price of a good causes a 1% change in the quantity demanded, the good has an elasticity of demand: a. equal to 1. b. less than 1. c. equal to 0. d. greater than 1. Americans were obsessed with heroes like Babe Ruth and Charles Lindbergh in the 1920s. Why did both men appeal to Americans at the time? Hydrogen bonds are too weak to bind atoms together to form molecules, but they do hold different parts of a single large molecule in a specific three-dimensional shape. Hydrogen bonds are too weak to bind atoms together to form molecules, but they do hold different parts of a single large molecule in a specific three-dimensional shape. True False When in a literature review is it appropriate to devote one or more paragraphs to a particular author s work?